Skip to content
electricistaentrevegas.comReport a fault
Menu

Electrical certificate in Murcia to get your power connected

We inspect the installation, put right anything that doesn't comply, issue the electrical installation certificate (CIE) and file it, so you can sign up for electricity in your home, villa or business premises.

Electrician testing the consumer unit of a new villa before issuing the electrical certificate

Electrical certificates and legalisation

Electrical certificate: what it involves

The boletín eléctrico is what everyone calls the electrical installation certificate, the CIE. It is the document in which the electrical contractor declares that the low-voltage installation of a home, shop or industrial unit complies with the Low Voltage Electrotechnical Regulations (REBT), and among other details it states the maximum power the installation can take. Without it, the distribution company will not connect a new supply or restore one that has been disconnected for some time.

Our job is not filling in a form. We visit the property, check the consumer unit, the earthing, the RCDs, the cable sizes and the condition of the circuits, and we measure insulation and earth resistance. If something doesn't comply, we fix it before certifying: a certificate signed for an installation that isn't right is a risk for whoever lives or works there.

We issue certificates in Murcia city and its outlying districts (pedanías), in the new villas and developments of Corvera and the airport area, around the Mar Menor and along the coast of Torrevieja and Orihuela Costa, where many second homes need a new certificate to get power back after years shut up.

Cases and jobs

Electrical certificates we issue

The ones we are asked for most, with an explanation, followed by the other jobs in this service.

Certificate to get power connected in a flat with no supply

A flat that has stood empty, an inherited home or a recent purchase where the electricity was cut off long ago. We check the consumer unit, the earthing, the RCDs and every circuit, measure insulation and earth resistance and correct anything that doesn't comply. Then we issue the certificate and register it. With the CIE in hand you sign up with the supplier of your choice and the distribution company connects the supply.

New villa in Corvera or the airport area

Detached and semi-detached villas on recent developments in Corvera and around the airport, many of them self-built, with the work finished and no electricity contract yet. We check that what was built matches the technical report or the project, inspect the general protection box (CGP), the individual supply line and the earthing, and prepare the paperwork for the connection. If the villa has a pool, an aerothermal heat pump or pre-wiring for an electric car, those circuits go into the certificate with their protection.

Coastal apartment shut up for years that needs power again

Apartments in La Manga, Lo Pagán, Torrevieja or Orihuela Costa that have been closed for years with the contract cancelled. Salt air and damp attack terminals, switches and sockets and the consumer unit itself. We clean or replace whatever is damaged, bring the RCDs up to date, check the earthing and issue the certificate the distribution company requires to reconnect.

Second home or country house in the outlying districts

Houses in Corvera, Gea y Truyols, Baños y Mendigo or Sangonera la Verde used at weekends and in summer, nearly always with additions made over the years: a porch, a summer kitchen, the pool pump or the light in the storeroom. We inspect each addition as part of the installation, bring it into line with the REBT and issue the certificate with all the real circuits, not just the ones the original house had.

Certificate for a shop or a change of business activity

Premises reopening with a different business, from a shop to a hair salon or from an office to a café, with more equipment and a different electrical load. We review the installation with the new use in mind, calculate the power, adapt circuits and protection, fit emergency lighting where the premises require it and prepare the certificate and technical documents that go with the town hall opening licence application.

More cases we deal with

  • Change of account holder when a certificate is required

    If the distribution company has no valid certificate for the home or the supply is disconnected, a change of account holder requires a certificate. We inspect the installation and issue it so the new holder can sign the contract in their name.

  • Inherited home with the power cut off

    A family house that has been without a contract for some time and that the heirs want to use, let or sell with a supply. We inspect it, bring the essentials up to date and certify it.

  • Certificate for an industrial unit or farm storehouse

    Units and storehouses in the Vega del Segura and the Campo de Murcia with irrigation pumps, cold rooms or machinery. We check the installation, the power and whether it should be single-phase or three-phase, and prepare the certificate.

  • Certificate after a full renovation

    If you have renewed the installation, added circuits or changed the consumer unit, what was certified no longer resembles what is there. We issue a new certificate with the real circuits so the paperwork matches what runs through the walls.

  • From temporary building supply to permanent supply

    When a home is finished, the temporary construction supply has to give way to the permanent one. We inspect the completed installation and issue the certificate used to apply for the permanent connection.

  • Certificate for a holiday let

    Flats and apartments on the coast that are let in summer. We leave the installation inspected, with RCDs that trip when they should and the earthing checked, and the certificate ready for the electricity contract.

  • Bungalow on an 80s or 90s development

    Bungalows and townhouses in Orihuela Costa, Torrevieja or the Mar Menor with the original installation, unearthed sockets or a single old RCD. We bring them up to date and issue the certificate.

  • Certificate with a power increase

    When the power you need exceeds the maximum allowed on your current certificate, a new one is required. We check the individual supply line and the consumer unit, adapt them and certify the new power.

  • Home with a lost certificate

    If you can't find the certificate and the distribution company doesn't have it either, we inspect the installation and issue a new one. If everything complies, it is certified as it is; if not, we fix what's wrong first.

  • Villa swimming pool included in the certificate

    The pool pump and lights must appear on the certificate. We check their circuit, the 30 mA RCD, that the lights run at 12 V and the equipotential bonding of the metal parts.

  • Certificate for an EV charging point installation

    When an electric car charger is fitted on its own circuit, that new installation is documented with its own certificate. We issue it together with the charger installation.

  • Garage, storeroom or shed with its own meter

    Small, separate supplies: a garage, a storeroom with a meter, a shed on an allotment or a well pump. They also need a certificate to sign a contract, and we issue it with the same checks as for a home.

What the CIE is and when you are asked for it

The electrical installation certificate is signed by a registered low-voltage electrical contractor after carrying out or inspecting the installation and completing the checks set by the REBT. It comes with a technical design report (memoria técnica de diseño) or, for large installations and some types of premises, a project signed by a qualified engineer. Once it is registered with the competent body of the autonomous region, the account holder receives their copy and can use it to sign up for a supply.

These are the situations in which it is most often requested:

  • Connecting a new supply: a new build, a home that has never had electricity or premises split off from another.
  • Reconnecting a supply that has been disconnected for some time or for which no certificate is available.
  • A power increase above the maximum allowed on the current certificate.
  • Renovations, extensions or changes of use that alter the certified installation.
  • A change of account holder when the distribution company has no valid certificate.

How it is filed in the Region of Murcia and the Valencian Community

In the Region of Murcia, the electrical contractor files the certificate and its documents online with the regional directorate-general responsible for industry and energy, which people commonly call "registering it with Industria". Once it is registered, the account holder receives their copy and signs up with an electricity supplier, which passes the request on to the local distribution company.

Torrevieja, Orihuela, Guardamar del Segura and Pilar de la Horadada are already in the Comunitat Valenciana, where the certificate is registered with the Generalitat's regional ministry (conselleria) responsible for industry and energy, also through its online portal. The technical regulations are the same, because the REBT is national, but the forms, fees and some steps differ from one region to the other. We explain which documents are needed depending on where the property is.

One part doesn't depend on the electrician: if the distribution company has to work on the service connection or charges fees for the connection or the power, it deals with the account holder directly. We tell you before we start so there are no surprises.

What you get

What you get when we do it

  • A genuine inspection

    We measure insulation and earthing and test the RCDs: the certificate describes what is there, not what ought to be.

  • We fix what's missing

    If something doesn't comply, we correct it ourselves before certifying, so you don't have to find another electrician.

  • The process explained

    We tell you which documents are needed, who files them and which part depends on the distribution company and the supplier.

  • On both sides of the regional border

    We handle the paperwork in the Region of Murcia and the Comunitat Valenciana, for homes on the Mar Menor, in Pilar de la Horadada or Torrevieja.

How we work

How we fix it, step by step

  1. Tell us about your case

    Through the form or by email: type of property, whether it has power or not, the power you want and whether there is a previous certificate.

  2. We inspect the installation

    We visit the property, check the consumer unit, earthing and circuits, and tell you what is fine and what needs bringing up to standard.

  3. We upgrade and measure

    We make the corrections, repeat the measurements and leave the installation ready to be certified.

  4. Certificate and registration

    We write the technical report and the certificate, file them with Industria and hand you your copy so you can sign up for a supply.

Frequently asked questions

Questions about electrical certificate

How much does an electrical certificate cost in Murcia?

It mainly depends on four things: the type and size of the property, the number of circuits, the power to be certified and, the biggest factor, whether the installation already complies or needs upgrades such as fitting earthing, replacing the RCD or renewing the consumer unit. It also matters whether a technical report is enough or a project is required. The regional fees and whatever the distribution company charges for the connection are separate and don't go to the electrician. Once we have seen the installation, we give you a detailed quote separating the certificate from the repairs.

What is the difference between a boletín and an electrical installation certificate?

None. "Boletín" is the popular name for the electrical installation certificate (CIE), inherited from the old paper installation forms. Today it is a certificate signed by the electrical contractor and registered online together with the technical report or the project for the installation.

Do I need a certificate to change the name on the electricity contract?

If the supply is live and you are not changing the power or the installation, the change of account holder is done with the supplier and a certificate is not usually requested. It is required when the supply is disconnected or cut off, when you want more power than the installation allows, or when the distribution company has no valid certificate for that home.

How long is an electrical certificate valid?

The certificate has no expiry date as such: it remains valid as long as the installation is still the one that was certified. When the installation changes, when the certified power is exceeded or when a supply has been disconnected for some time, the distribution company may ask for a new one, and for that the installation has to meet the current regulations, not those in force when the old certificate was issued.

Can the certificate be issued if the house has no earthing?

Not without fitting it first. To be certified, the installation needs earthing with the sockets connected to it. In flats in older blocks and in country houses it is one of the most common upgrades: we check whether the building has an earthing network to connect to or whether earth rods need to be driven in, and we run the protective conductor to every circuit.

Do you issue certificates in Torrevieja and Orihuela Costa, which are in Alicante?

Yes. We work on the coast of Torrevieja and Orihuela Costa, in Guardamar del Segura and in Pilar de la Horadada, where the certificate is registered in the Comunitat Valenciana. The inspection and upgrades are the same as in Murcia, because the REBT is national; what changes is the administrative procedure, and we take care of that.

What details do I need to have to hand?

The account holder's details, the exact address or the cadastral reference, the previous certificate if there is one, the CUPS supply point code if you have it (it appears on any old bill) and the power you want to contract. For a new build, also the technical report or project the installation was based on. If the property has no power, tell us whether a meter is installed or only the general protection box.

You may also be interested in

Related services

Rewiring

Old installations with no earthing or two-wire circuits, kitchen and bathroom refits, shops, new-build villas, air conditioning lines and swimming pools.

See the service

Shall we talk it through?

Tell us what you need and where it is: we will reply with what it takes to do it properly.